Project: MRS2: Conversion Quaife ATB & Metal Catalyst

Discussion in 'Megane Projects' started by arno samimi, Feb 18, 2015.

  1. all needed parts:

    9ABeWP.jpg

    removed from above:

    nYWnTm.jpg

    also from below:

    Ahh7mS.jpg

    already out:

    Gba9o1.jpg

    fRkyf1.jpg

    fixed on the holder:

    nOKUOZ.jpg

    dissembled is fast:

    AVIeSg.jpg

    wZc4tC.jpg

    unpacked the ATB, unscrewed the crown:

    DxDHle.jpg

    JzaFFk.jpg

    mounted new bearings, screwed the crown:

    WZYR8W.jpg

    ELmLp7.jpg

    inside and is already turning by itself:

    zauRQs.jpg

    mounted the other parts:

    BZRQDA.jpg

    all cleaned, apply the sealant and mounted the cover, mounted the outer parts and ready to install in the MRS2:

    RKeAad.jpg

    qfhvqT.jpg

    back into it:

    IuJ9Nf.jpg

    all mounted from below:

    GHddFn.jpg

    also from above:

    4W1leJ.jpg

    U17hAw.jpg
     
  2. again a familiar image:

    Hy1ngG.jpg

    finish:

    XFsCGh.jpg

    not to forget to fill in the lifetime warranty card and send it to quaife:

    EoXno9.jpg

    at the same time installed the metal catalyst:
    yet installed here, space completely filled:

    SaIZYu.jpg

    without mounted gearbox and front axle, very easy to dissamble:

    oUobJM.jpg

    conversion both lambda sensors:

    f1pzpg.jpg

    mounted the metal catalyst and it remains very much space:

    walrcO.jpg

    from above also all good. all connections are in the right place:

    f75GAk.jpg

    mounted the shield, looks like original, finish:

    dyUMmo.jpg
     
  3. [video=youtube;aoubSrmrrao]https://www.youtube.com/watch?v=aoubSrmrrao[/video]
     
  4. You make it look all so easy lol
     
  5. :wink:
     
    Last edited: Feb 19, 2015
  6. It's easy. Looks worse than it is. Really...
     

  • Share This Page